Home

Most Current Image

I hope it survives the trip.

dsc_5283

This is the current state of the layout.

All the wiring is 100% complete. I have put the wire cutters away, there is nothing left to do. It was operational 2 weeks ago, but still needed a lot of little tweaks, the last of which I finished today.

It runs far better than I had expected. The locomotive performs great! I will post more about that after the train show.

Next, I need to make a temporary connection between the layout and the carfloat so I can operate that, I have a precarious connection there now. I would also like to make a mock up of the freight house, will see if I have time for that or not.

But at least it is working, and for the most part ready for the show.

geez, look at the time….

-T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 06-27-2009 | 10:06 PM
Posted in: CNJ 1000 Boxcab | Track Construction | wiring | Comments (1)

Painting Track

No more PC board ties…

Yesterday I painted all the trackwork on the layout. Well, almost all of it, I decided to leave one three way turnout and a length of track unpainted until after the train show so people can see the construction technique.

If you smelled Floquil paint in the air yesterday, it was from me, sorry about that….

It almost didn’t get done. I started early on it, hoping to finish the painting before noon. I noticed my airbrush needed cleaning, so I took it apart and soaked all the parts in lacquer thinner, which dissolves all the hardened paint deposits. When I reassembled it I had no air. A few minutes playing with it and I realized I should not have soaked the air valve in lacquer thinner as there is an O ring in it that swelled up to twice the size and cut off the air. I hunted up the part number on Badgers site (I have a 155 airbrush) and started phoning around for one. I managed to finally locate on in Dundas, about 35 minutes from here. So I made a trip out to get it, which killed 2 hours.

With that fixed up I started painting, as shown in the video. 2 hours into the job and we had a nasty thunderstorm that knocked out the power for 2 hours. I managed to finish up the painting at 10 pm.

Its all done now, and looks much better. It is only a base coat, I will be doing more to it later prior to ballasting, but for now it is an improvement over the bare copper ties, although that did create a neat effect…

dsc_5223

All the track is painted with Floquil’s Railroad Tie Brown, unthinned, straight from the bottle. I used 3 jars for the job. Unfortunately two of the three were from a bad batch and the colour didn’t match the first one very well. It really won’t matter though.

After I paint a section of track, I immediately clean the the paint from the rails using small squares of wood. This makes quick work of cleaning up the rail, and also keeps me from accidentally disturbing the paint on the PC board ties. A few passes is all it takes to get 99% of the paint off the rails. If the paint dries a bit I simply dip the wood block into some lacquer thinner and give it a rub followed with a pass from a dry piece of wood. I cut up a bag of a few hundred of these blocks ahead of time so I have plenty on hand when painting. Once dry, I give everything a cleaning with a bright boy.

dsc_5239

dsc_5229

This week I also finished off my brass model of CNJ 1000, which there are some shots of in the video.

dsc_5246-1

dsc_5241

dsc_5246

room-panorama

Getting closer…..

-T.

On to Next Section…

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 06-26-2009 | 10:06 AM
Posted in: CNJ 1000 Boxcab | Latest Posts | Track Construction | Video | Weathering | Comments (8)

Re-Motoring Completed

Completed enough.

I’m trying a new gallery tool, if it does anything funny let me know.  Click on the pictures for large versions.

Last evening I finished re-assembling the engine and soldering on a few missing parts.  I think this is as far as I will go with this for now as I want to get some other things completed before the next train show.

It runs great!  Nice and smooth with excellent slow speed performance.  This is with DC, once I install a good decoder with back EMF that performance will get even better.

I have a video of it running, if I can get it uploaded I will add it here.

Below….

On to Next Section

-T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 11-12-2008 | 12:11 PM
Posted in: CNJ 1000 Boxcab | Comments (2)

« Previous Entries   Next Entries »