{"id":2940,"date":"2009-03-26T04:46:24","date_gmt":"2009-03-26T09:46:24","guid":{"rendered":"http:\/\/www.bronx-terminal.com\/?p=2940"},"modified":"2009-03-26T04:46:24","modified_gmt":"2009-03-26T09:46:24","slug":"curved-turnouts-finished","status":"publish","type":"post","link":"https:\/\/www.bronx-terminal.com\/?p=2940","title":{"rendered":"Curved Turnouts Finished"},"content":{"rendered":"<p><strong>Finally<\/strong><\/p>\n<p><object width=\"500\" height=\"315\"><param name=\"movie\" value=\"http:\/\/www.youtube.com\/v\/9Vnpn-Iad9w&#038;hl=en&#038;fs=1&#038;rel=0&#038;color1=0x3a3a3a&#038;color2=0x999999&#038;border=1\"><\/param><param name=\"allowFullScreen\" value=\"true\"><\/param><param name=\"allowscriptaccess\" value=\"always\"><\/param><embed src=\"http:\/\/www.youtube.com\/v\/9Vnpn-Iad9w&#038;hl=en&#038;fs=1&#038;rel=0&#038;color1=0x3a3a3a&#038;color2=0x999999&#038;border=1\" type=\"application\/x-shockwave-flash\" allowscriptaccess=\"always\" allowfullscreen=\"true\" width=\"500\" height=\"315\"><\/embed><\/object><\/p>\n<p>Last evening I finished off the construction of the largest section of trackwork, the 4 #3 3 way curved turnouts that wrap around the outside of the freight house.<\/p>\n<p>I did the basic construction of these two years back, and over the last couple weeks finished off adding the remaining ties and hinging all 8 sets of switch points.<\/p>\n<p>Still a few more smaller sections of track to complete, but getting this one out of the way is a bit of a milestone!<\/p>\n<p>-T.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Finally Last evening I finished off the construction of the largest section of trackwork, the 4 #3 3 way curved turnouts that wrap around the outside of the freight house. I did the basic construction of these two years back, and over the last couple weeks finished off adding the remaining ties and hinging all [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,8,46],"tags":[27,32,47,48,49,28,31,33,51],"class_list":["post-2940","post","type-post","status-publish","format-standard","hentry","category-front-page","category-track-construction","category-cnj-bronx-videos","tag-cnj-bronx-terminal","tag-handlaid-track","tag-hinged-points","tag-switch-points","tag-switchpoints","tag-tim-warris","tag-trackwork","tag-turnout","tag-video"],"_links":{"self":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/2940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2940"}],"version-history":[{"count":1,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/2940\/revisions"}],"predecessor-version":[{"id":2941,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/2940\/revisions\/2941"}],"wp:attachment":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}