{"id":3147,"date":"2009-05-13T20:41:43","date_gmt":"2009-05-14T01:41:43","guid":{"rendered":"http:\/\/www.bronx-terminal.com\/?p=3147"},"modified":"2009-05-17T09:24:19","modified_gmt":"2009-05-17T14:24:19","slug":"mind-the-gap","status":"publish","type":"post","link":"https:\/\/www.bronx-terminal.com\/?p=3147","title":{"rendered":"Mind The Gap"},"content":{"rendered":"<p><strong>All Gaps Cut<\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4454.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3149\" title=\"dsc_4454\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4454-500x334.jpg\" alt=\"dsc_4454\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4454-500x334.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4454-150x100.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4454.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p><em><strong>I am 98.675% confident I got them all&#8230;.<\/strong><\/em><\/p>\n<p>With the NMRA Train Show rapidly approaching, I am focusing hard on getting this damn thing running.\u00a0 Reaching that goal will take a lot of work over the next weeks.\u00a0 This week, I am spending most of my time working on the layout, and so far I am making pretty good progress.<\/p>\n<p>It took two full days to cut all the rail isolation gaps in all the trackwork.\u00a0 I worked very slowly and carefully being careful not to damage any of the trackwork and also to be certain I didn&#8217;t miss any.\u00a0 Missing one would be very not good.\u00a0 Some of the gaps can not be cut after the track is installed as they have to be done using a jewelers saw due to the tight clearances involved.\u00a0 Most of my time was spent studying the individual track pieces and determining where to make the cuts.<\/p>\n<p>After the gaps were cut, they sections were tested with a continuity checker to make sure there were no shorts or missing gaps.<\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4455.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3150\" title=\"dsc_4455\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4455-334x500.jpg\" alt=\"dsc_4455\" width=\"334\" height=\"500\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4455-334x500.jpg 334w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4455-100x150.jpg 100w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4455.jpg 686w\" sizes=\"auto, (max-width: 334px) 100vw, 334px\" \/><\/a><\/strong><\/p>\n<p>The job wasn&#8217;t as bad as I thought it would be.<strong> <\/strong>Until this stage in construction I could not cut any of the gaps as it makes the track sections weak, and I needed to handle them quite a bit, so I delayed the job until the last possible minute.\u00a0 This meant spending 2 years thinking about it and answering the question, &#8220;how you going to wire that thing?&#8221;.<br \/>\n<strong><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4468.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3157\" title=\"dsc_4468\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4468-500x334.jpg\" alt=\"dsc_4468\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4468-500x334.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4468-150x100.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4468.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4465.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3156\" title=\"dsc_4465\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4465-500x220.jpg\" alt=\"dsc_4465\" width=\"500\" height=\"220\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4465-500x220.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4465-150x66.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4465.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4463.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3154\" title=\"dsc_4463\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4463-500x334.jpg\" alt=\"dsc_4463\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4463-500x334.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4463-150x100.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4463.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4460.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3153\" title=\"dsc_4460\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4460-500x334.jpg\" alt=\"dsc_4460\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4460-500x334.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4460-150x100.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4460.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4464.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3155\" title=\"dsc_4464\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4464-500x372.jpg\" alt=\"dsc_4464\" width=\"500\" height=\"372\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4464-500x372.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4464-150x111.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4464.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4459.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3152\" title=\"dsc_4459\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4459-500x334.jpg\" alt=\"dsc_4459\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4459-500x334.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4459-150x100.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4459.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4457.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3151\" title=\"dsc_4457\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4457-500x229.jpg\" alt=\"dsc_4457\" width=\"500\" height=\"229\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4457-500x229.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4457-150x68.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4457.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p>Today, I fit all the sections together and soldered them into a single piece.\u00a0 All the missing PC board ties have been added in.\u00a0 It is now, finally, all sitting in place.\u00a0 This was another job I have been thinking about for two years!<\/p>\n<p>It all went together well, fitting very precisely and seems to run smoothly when I push a car or two through it.\u00a0 Until the switch machines are installed, its very difficult to tell how well it will actually run as the switch points don&#8217;t yet seat precisely, need the switch machines to hold them tight in place.<\/p>\n<p>I still have another piece of trackwork to make, one final turnout.\u00a0 I will make that one up tomorrow and install it into the rest of the trackwork.\u00a0 Other than the straight yard tracks, its the trackwork\u00a0 construction is pretty much complete.<\/p>\n<p>Will have to make up a &#8220;Golden PC Board Tie&#8221; and have a little ceremony with some local dignitaries for the last solder.\u00a0 There will be speeches and polite applause.<\/p>\n<p><strong><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4471.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3148\" title=\"dsc_4471\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4471-500x334.jpg\" alt=\"dsc_4471\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4471-500x334.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4471-150x100.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_4471.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/strong><\/p>\n<p>A local dignitary inspecting some trackwork.\u00a0 He barked in lieu of applause.<\/p>\n<p>-T.<\/p>\n<p>On to <a href=\"https:\/\/www.bronx-terminal.com\/?p=3168\">Next Section&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>All Gaps Cut I am 98.675% confident I got them all&#8230;. With the NMRA Train Show rapidly approaching, I am focusing hard on getting this damn thing running.\u00a0 Reaching that goal will take a lot of work over the next weeks.\u00a0 This week, I am spending most of my time working on the layout, and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,4,8],"tags":[27,42,88,32,89,49,28,31,33,141],"class_list":["post-3147","post","type-post","status-publish","format-standard","hentry","category-cutting-gaps","category-front-page","category-track-construction","tag-cnj-bronx-terminal","tag-code-70","tag-gaps","tag-handlaid-track","tag-isolation-gaps","tag-switchpoints","tag-tim-warris","tag-trackwork","tag-turnout","tag-wiring"],"_links":{"self":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3147","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3147"}],"version-history":[{"count":10,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3147\/revisions"}],"predecessor-version":[{"id":3178,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3147\/revisions\/3178"}],"wp:attachment":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}