{"id":3207,"date":"2009-05-23T08:51:44","date_gmt":"2009-05-23T13:51:44","guid":{"rendered":"http:\/\/www.bronx-terminal.com\/?p=3207"},"modified":"2009-05-25T22:00:53","modified_gmt":"2009-05-26T03:00:53","slug":"finally-gluing-trackwork-in-place","status":"publish","type":"post","link":"https:\/\/www.bronx-terminal.com\/?p=3207","title":{"rendered":"Finally Gluing Trackwork in Place"},"content":{"rendered":"<p><strong>Its permanent, no turning back now!<\/strong><\/p>\n<p><object width=\"500\" height=\"315\"><param name=\"movie\" value=\"http:\/\/www.youtube.com\/v\/8tDy-2jLGzw%26hl=en%26fs=1%26rel=0%26border=1\"><\/param><param name=\"allowFullScreen\" value=\"true\"><\/param><param name=\"allowscriptaccess\" value=\"always\"><\/param><embed src=\"http:\/\/www.youtube.com\/v\/8tDy-2jLGzw%26hl=en%26fs=1%26rel=0%26border=1\" type=\"application\/x-shockwave-flash\" allowscriptaccess=\"always\" allowfullscreen=\"true\" width=\"500\" height=\"315\"><\/embed><\/object><\/p>\n<p>Well, after 2 years of putzing around with it, I am finally ready to glue the trackwork permanently in place.  I decided to use construction adhesive for the job, I figured its all or nothing, once its glued down, there will be no removing it.  I applied the adhesive with a putty knife, carefully avoiding the area where the throwbars have to remain free.  The track was carefully laid in place into the adhesive and it pressed down.  Once cured, I cut the sections at the layout joints.  It all went well, with no disasters.<\/p>\n<p>Now, I am installing the 30 Tortoises onto the layout.<\/p>\n<p>-T.<\/p>\n<p>On to <a href=\"https:\/\/www.bronx-terminal.com\/?p=3209\">Next Section&#8230;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Its permanent, no turning back now! Well, after 2 years of putzing around with it, I am finally ready to glue the trackwork permanently in place. I decided to use construction adhesive for the job, I figured its all or nothing, once its glued down, there will be no removing it. I applied the adhesive [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,8,46],"tags":[27,94,32,28,31,33],"class_list":["post-3207","post","type-post","status-publish","format-standard","hentry","category-front-page","category-track-construction","category-cnj-bronx-videos","tag-cnj-bronx-terminal","tag-gluing-trackwork","tag-handlaid-track","tag-tim-warris","tag-trackwork","tag-turnout"],"_links":{"self":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3207"}],"version-history":[{"count":2,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3207\/revisions"}],"predecessor-version":[{"id":3214,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3207\/revisions\/3214"}],"wp:attachment":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}