{"id":3354,"date":"2009-06-13T15:15:18","date_gmt":"2009-06-13T20:15:18","guid":{"rendered":"http:\/\/www.bronx-terminal.com\/?p=3354"},"modified":"2009-06-15T08:39:57","modified_gmt":"2009-06-15T13:39:57","slug":"cnj-bronx-terminal-fully-operational","status":"publish","type":"post","link":"https:\/\/www.bronx-terminal.com\/?p=3354","title":{"rendered":"CNJ Bronx Terminal Fully Operational"},"content":{"rendered":"<p><strong>It all runs.<\/strong><\/p>\n<p><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5155.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-3358\" title=\"dsc_5155\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5155-500x334.jpg\" alt=\"dsc_5155\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5155-500x334.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5155-150x100.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5155.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<h2 style=\"text-align: center;\">June 13, 2009, 3:41pm<\/h2>\n<p style=\"text-align: left;\">The last route has been programmed, the layout is now fully operational.<\/p>\n<p style=\"text-align: left;\">While a nice milestone, I still hava a long way to go to meet my goal of having it running at the NMRA Train Show next month.\u00a0 But its good to know that it all works as hoped.<\/p>\n<p style=\"text-align: left;\">Talk about a complicated little bugger.<\/p>\n<p style=\"text-align: left;\">-T.<\/p>\n<p>On to <a href=\"https:\/\/www.bronx-terminal.com\/?p=3361\">Next Section&#8230;.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It all runs. June 13, 2009, 3:41pm The last route has been programmed, the layout is now fully operational. While a nice milestone, I still hava a long way to go to meet my goal of having it running at the NMRA Train Show next month.\u00a0 But its good to know that it all works [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,8,90],"tags":[],"class_list":["post-3354","post","type-post","status-publish","format-standard","hentry","category-front-page","category-track-construction","category-wiring"],"_links":{"self":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3354"}],"version-history":[{"count":6,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3354\/revisions"}],"predecessor-version":[{"id":3385,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3354\/revisions\/3385"}],"wp:attachment":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}