{"id":3443,"date":"2009-06-27T22:31:44","date_gmt":"2009-06-28T03:31:44","guid":{"rendered":"http:\/\/www.bronx-terminal.com\/?p=3443"},"modified":"2009-06-27T22:31:44","modified_gmt":"2009-06-28T03:31:44","slug":"most-current-image","status":"publish","type":"post","link":"https:\/\/www.bronx-terminal.com\/?p=3443","title":{"rendered":"Most Current Image"},"content":{"rendered":"<p><strong>I hope it survives the trip.<\/strong><\/p>\n<p><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5283.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5283-500x233.jpg\" alt=\"dsc_5283\" title=\"dsc_5283\" width=\"500\" height=\"233\" class=\"alignnone size-medium wp-image-3444\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5283-500x233.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5283-150x70.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/dsc_5283.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<p>This is the current state of the layout.<\/p>\n<p>All the wiring is 100% complete.  I have put the wire cutters away, there is nothing left to do.  It was operational 2 weeks ago, but still needed a lot of little tweaks, the last of which I finished today.<\/p>\n<p>It runs far better than I had expected.  The locomotive performs great!  I will post more about that after the train show.<\/p>\n<p>Next, I need to make a temporary connection between the layout and the carfloat so I can operate that, I have a precarious connection there now.  I would also like to make a mock up of the freight house, will see if I have time for that or not.<\/p>\n<p>But at least it is working, and for the most part ready for the show.<\/p>\n<p>geez, look at the time&#8230;.<\/p>\n<p>-T.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>I hope it survives the trip. This is the current state of the layout. All the wiring is 100% complete. I have put the wire cutters away, there is nothing left to do. It was operational 2 weeks ago, but still needed a lot of little tweaks, the last of which I finished today. It [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20,8,90],"tags":[],"class_list":["post-3443","post","type-post","status-publish","format-standard","hentry","category-cnj-1000-boxcab","category-track-construction","category-wiring"],"_links":{"self":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3443"}],"version-history":[{"count":1,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3443\/revisions"}],"predecessor-version":[{"id":3445,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/3443\/revisions\/3445"}],"wp:attachment":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}