{"id":4142,"date":"2012-04-10T10:34:23","date_gmt":"2012-04-10T15:34:23","guid":{"rendered":"http:\/\/www.bronx-terminal.com\/?p=4142"},"modified":"2012-04-10T10:37:07","modified_gmt":"2012-04-10T15:37:07","slug":"off-to-some-shows-for-a-month","status":"publish","type":"post","link":"https:\/\/www.bronx-terminal.com\/?p=4142","title":{"rendered":"Off to some shows for a month&#8230;"},"content":{"rendered":"<p><a href=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/DSC_2733.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-4143\" title=\"CNJ Bronx Terminal\" src=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/DSC_2733-500x357.jpg\" alt=\"\" width=\"500\" height=\"357\" srcset=\"https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/DSC_2733-500x357.jpg 500w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/DSC_2733-150x107.jpg 150w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/DSC_2733-1024x732.jpg 1024w, https:\/\/www.bronx-terminal.com\/wp-content\/uploads\/DSC_2733.jpg 1200w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<p><strong>Just when I get started&#8230;<\/strong><\/p>\n<p><strong><\/strong>The paving project will have to wait for a while as tomorrow I am taking the layout up to the <a href=\"http:\/\/www.cvrco.com\/\" target=\"_blank\">Credit Valley Model Railway<\/a> train shop in Toronto for their local layout tour this coming Saturday April 14th.<\/p>\n<p>It will remain there until the end of the month when I will pick it up on the way to Ottawa for the inaugural <a href=\"http:\/\/ottawatrainexpo.com\/en\/main.php?page=welcome.html\" target=\"_blank\">Ottawa Train Expo<\/a>, being held on May 5 and 6th.\u00a0 The layout will be set up and operating in the Fast Tracks booth for the duration of the show.\u00a0 If you are in the area, be sure to check out this show!<\/p>\n<p>Cheers!<\/p>\n<p>-T.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Just when I get started&#8230; The paving project will have to wait for a while as tomorrow I am taking the layout up to the Credit Valley Model Railway train shop in Toronto for their local layout tour this coming Saturday April 14th. It will remain there until the end of the month when I [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-4142","post","type-post","status-publish","format-standard","hentry","category-front-page"],"_links":{"self":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/4142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4142"}],"version-history":[{"count":4,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/4142\/revisions"}],"predecessor-version":[{"id":4146,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=\/wp\/v2\/posts\/4142\/revisions\/4146"}],"wp:attachment":[{"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bronx-terminal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}