Home

CNJ 1000 Switching at the Bronx Terminal

Full Length Video
honestly….

I was going to wait until the start of the Train Show on Friday to post some video of the layout operating but figured why wait. Today I will be dismantling the layout, packing it up and stuffing it into the van. We leave tomorrow morning. I suspect I would not get time to do it otherwise so I decided to post it now.

I shot this video last evening so it is very current. It is the boxcab switching the freight house and loading some cars onto the carfloat.

Youtube has a tendency of making model railroad videos look jerky when they play. The boxcab is a very smooth operating engine, any jerky motion is in the video. Youtube also has a tendency of making cars derail, but I got lucky on this video.

If you really want to see it running, stop by the Train Show next weekend! If it doesn’t fall out of the van, it will be set up and running there.

-T.

This is the most recent construction related post.

Check back soon for an update! In the meantime, the category links to the right are full of interesting content.

First time here? Click here to start at the beginning of the Bronx Terminal project.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 07-04-2009 | 08:07 AM
Posted in: 2009 NMRA Train Show - Hartford | CNJ 1000 Boxcab | Latest Posts | Track Construction | Video | Comments (11)

  Next Entries »