February 14, 2013 Painting Update
Another Larry Fisher installment.
The float bridge and loaded car float is finished, as well as CNJ 1000 and the idler car that is approaching the float bridge to haul a rake of loaded cars from the float. In the front of the view is a simple mock up of the soon to be added Bronx tug and another loaded float. A few more weeks until its ready!
About the Author:
I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!
Posted by: Tim | 02-14-2013 | 12:02 PM
Posted in: Limited Edition Print | Comments (2)