Home

One Year Ago

well, one year and two weeks…

Geez, its hard to believe but its been a year since construction was started on The Building. I dug up this video shot last year of the excavator knocking down a big willow tree. It made very short work breaking apart the tree, but could not get the stump out at the same time. A day later he simple hooked onto the stump and yanked it out with no effort at all.

Where this tree once stood we now have a driveway.

A gallery of photos documenting the whole building process can be found here….

-T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 04-01-2008 | 10:04 AM
Posted in: Picture of the Day | Comments (0)

Big Weiner.

At the Ford Museum

oscar myer wiener mobile

The Wienermobile was on display last summer at the Ford Museum in Dearborn. We visited after the NMRA Train Show in July and since I don’t have any new current pictures, I dug this up.

Finish this line: “Oh I wish I were an….”

Good, now we both have that song stuck in our head.

-T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 03-31-2008 | 10:03 AM
Posted in: Picture of the Day | Comments (0)

The Great Divide

Clips and Clamps in place

CNJ Bronx Terminal

Last night I finished off the installation of the alignment clips (the silver pieces sticking out) and the clamps. Everything now locks up nice and tight. Ready to move onto the next step!

-T

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 03-28-2008 | 09:03 AM
Posted in: Picture of the Day | Comments (0)

« Previous Entries   Next Entries »