Picture of the Day – Feb. 3, 2009
Bronxquake
Making good progress setting the layout back up after returning from Springfield last week. This process takes about 45 minutes.
I’m currently on day 9.
-T.
About the Author:
I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!
Posted by: Tim | 02-03-2009 | 10:02 PM
Posted in: Latest Posts | Picture of the Day
What you need is a “round to it”.
I have one here somewhere.
🙂