Closing in on the final pieces

part-8-4

My goal is to get this damn thing running.  Preferably before the next major show, the NMRA Train Show in Hartford this July where the layout will be set up right in our Fast Tracks booth.

To that end, I am working on one of the last sections of trackwork with turnouts.  Part 8 consists of 3 #2.75 constant radius turnouts (don’t forget, these are all scaled directly from the prototype)

These turnouts lead into some of the team tracks, and into the wye.

part8

The pieces of trackwork are getting simpler as I go along, all that is left are basic turnouts, albeit very unusual ones.

part-8-3

I hope to have this completed by the end of the weekend.

The images here are computer renderings, not the actual trackwork.

part-8-5

part-8-2

part-8-1

I poked away at the design work for this section all week, and am ready now to start construction.

Once completed, I will of course post some images.

-T.

On to Next Section….

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 04-03-2009 | 04:04 PM
Posted in: Latest Posts | Track Construction

No Comments »

No comments yet.

Comments RSS TrackBack URI

 

Leave a comment