Home

Day 43

Waiting for a floor.

010507b.jpg

Roof is complete, the building wrap added and the upper windows installed, a productive day yesterday! Now we are waiting for the floor to be poured before they will go any further on construction. They prefer not to have the siding, doors or windows in place until after the floor is poured so spare them from any potential damage.

010507b1.jpg

Everything is prepped and waiting for the concrete so arrive. Glad I don’t have to be at the business end of those wheelbarrows….

010507b2.jpg

The upstairs is now completely closed in, which changes the feel of the space dramatically.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 05-01-2007 | 10:05 AM
Posted in: Barn Raisin'!

No Comments »

No comments yet.

Comments RSS TrackBack URI

 

Leave a comment