Home

Wire complete

Passed!

080607bs.jpg

Another inspection complete! With the wiring rough in complete it can finally move on to the final construction. Insulation and drywall next.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 06-08-2007 | 02:06 PM
Posted in: Barn Raisin'!

1 Comment »

  1. I don’t know why anybody was worried, I had no doubts it would pass! We are talking about three guys who know what it is all about. Congrats!!!

    -Dad

    Comment by bill warris — June 9, 2007 @ 4:34 pm

Comments RSS TrackBack URI

 

Leave a comment