Home

Its alive….

Fresh from the dungeon.

170308a.jpg

The main benchwork for the Terminal is complete, and standing on its own four legs. I took these pictures yesterday, tonight I finished part of the first section of the upper pieces, which I will post some pictures of as soon as it looks like something.

170308c.jpg

170308b.jpg

I thought I should check to confirm that it would actually fit in the van. I removed the seats, which requires a Herculean effort as they each weigh 600 pounds.

170308d.jpg

Surprisingly, it actually fit, with a full .0575″ to spare…

170308e.jpg

Now that I have confirmed it will fit into the van I can move onto the next sections.

Back to the Dungeon!

On to Next Section

T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 03-17-2008 | 10:03 PM
Posted in: Benchwork Construction | Latest Posts

No Comments »

No comments yet.

Comments RSS TrackBack URI

 

Leave a comment