Home

HO Scale CNJ Bronx Terminal Construction

Construction Posts Index

Since there are lots of posts on this blog that are not necessarily related to the building of the CNJ Bronx Terminal, relevant posts about just construction can be tricky to follow.

To help make it easier to follow along with the building of the layout, I have added a “Next Section” link to the end of each post that deals with the build.  Simply click on that link to move onto the next post.  You can follow these all the way to the most recent relevant post.

I have broken down the posts into the following categories, in order from the beginning to the most recent:

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 11-25-2008 | 10:11 PM
Posted in: Latest Posts

No Comments »

No comments yet.

Comments RSS TrackBack URI

 

Leave a comment