Milestone #2

The Last Tie

June 14, 2009

10:00pm

After a marathon day yesterday, I finally got to solder the final PC board tie in place on the layout! Its been over 2 years of intermittent work, but the trackwork is finally completed.

dsc_5209

dsc_5199

dsc_5203

A rough estimate calculated about 4000 PC board ties on the layout, and at least 2 solder joints on each (most have 3 or 4), I guess there is over 8000 solder joints.

The final joint was honoured with a splash of 16 year old Scotch. Neat.

There is still a length of temporary trackwork to add in before the show, but the “official” trackwork is complete.

Anyone interested in a slightly used soldering station?

-T.

On to Next Section…

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 06-15-2009 | 08:06 AM
Posted in: Latest Posts | Track Construction | Video | Comments (2)

CNJ Bronx Terminal Fully Operational

It all runs.

dsc_5155

June 13, 2009, 3:41pm

The last route has been programmed, the layout is now fully operational.

While a nice milestone, I still hava a long way to go to meet my goal of having it running at the NMRA Train Show next month.  But its good to know that it all works as hoped.

Talk about a complicated little bugger.

-T.

On to Next Section….

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: warrisr | 06-13-2009 | 03:06 PM
Posted in: Latest Posts | Track Construction | wiring | Comments (17)

Programming

Its not a layout, its a computer…

dsc_5141

All the DS-64’s are connected to the Tortoises and relays. Next up, programming in the 30 routes. I am about 3/4 the way through the job and while it takes a great deal of concentration to get it correct, it seems to be going well.

routing-sheet

To keep everything organized and clear, I made up these Route Sheets. Each of the 30 routes has a corresponding sheet. I highlight the route on the sheet, and note the turnout settings for that route.

Also included on the sheet are the two crossings that are routed with relays. Each switched frog is identified with a 200 series number. These are set to either “Closed” or “Thrown” to set the frog to the appropriate power. I identified the North and South rails with red and black colours respectively. Each turnout has a unique number.

ds-64-route-sheet

To keep track of what route information is programmed into each DS-64 I made these sheets. Since some routes require multiple DS-64’s it is easy to loose track of what is where. These sheets will help keep track of all the routes. Some routes require up to 20 turnouts to switch.

dsc_5135

All the DS-64’s wired up and in an accessible location for programming. Once all the routes are programmed and tested, they will be mounted under the layout and all the wires trimmed to fit neatly.

dsc_5140

The “quad diamond” in the centre of the layout requires special attention. Shown here are the additional latching relays to route power to the 7 switched frogs in the crossing. Each of the 4 routes through the crossing require a different configuration of the frogs. Lots of clicking goes on when the routes are switched.

To make things even more interesting, the tail end of one of the routes is a wye. To keep things working I am using a Hex Frog Juicer to control the reverse section created by the wye. It works 100% reliably. I am quite impressed with these little units.

dsc_5138

Here are all the tools required to bring a model of the CNJ Bronx Terminal to life….

-T.

On to Next Section….

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: warrisr | 06-12-2009 | 10:06 PM
Posted in: 2007 NMRA Train Show - Detroit | LaSalette Freemo Module | Latest Posts | Track Construction | wiring | Comments (2)