Picture of the Day – March 3, 2009

andermatt06

Another faux model image I made up.  The original for this was posted yesterday on the Atlas Forum and since it is such a good candidate for modelization, I just could not resist!

-T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 03-03-2009 | 10:03 AM
Posted in: Latest Posts | Picture of the Day | Comments (2)

Picture of the Day – Feb. 26, 2009

HO Stub Switch

Stub Switch

Eye level view of an HO scale code 70 stub switch I built this week for an upcoming article in Model Railroad Hobbiest magazine, due out shortly.

-T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 02-26-2009 | 09:02 AM
Posted in: Latest Posts | Picture of the Day | Track Construction | Comments (5)

Trackwork Tedium

but its getting done!

Trackwork

Trackwork

For the last couple of evenings I have returned to finishing off the trackwork.  I admit, I have been procrastinating with this job because it is a bit on the tedious side.  One of these days I will have to count just how many PC board ties I have soldered in place on this layout, several thousand I suspect.

The results are worth it though, the finished track sections are rock solid and will never move, very important with trackwork such as this.

The hinging technique for the points also seems to be working well.  I can get two turnouts done in an evening.

TrackworkTrackwork

Most of the missing PC board ties have been added in to these sections.  I also finished off the curved track for the inner circle.

Trackwork

As I add in the missing ties, I also finish off the switch points, so the trackwork is fully completed and ready for the next phase of construction, which is cutting the rail gaps.  I don’t want to cut the gaps until I am ready to install the track in place as it will become weak.  I would love to get this done, so people will stop asking how I am going to do it!

Trackwork

Trackwork

A bit of progress.  I think there are now 8 turnouts completed.  The next section of trackwork consists of 8 more turnout points, so that should take a few more evenings.

I should have used Photoshop to remove that double chin in the first picture.

-T.

On to Next Section….

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 02-25-2009 | 11:02 PM
Posted in: Latest Posts | Track Construction | Comments (6)