Home

Gaps update

Oops.

gapping.jpg

A sharp eyed modeler pointed out a mistake in the gapping in the section shown above. The Blue/Pink/Green frogs can all be a single section, like in the image below….

gapping2.jpg

The logic being that only a single train can travel over the entire pink section at a time, therefore it isn’t necessary to isolate the three frogs, it can be left as a single section.

Thanks to David at The Gauge for pointing this out. It will save a few wires!

-Tim

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 04-08-2007 | 12:04 PM
Posted in: Latest Posts

No Comments

No comments yet.

Comments RSS

Sorry, the comment form is closed at this time.