Home

Curved Turnouts Finished

Finally

Last evening I finished off the construction of the largest section of trackwork, the 4 #3 3 way curved turnouts that wrap around the outside of the freight house.

I did the basic construction of these two years back, and over the last couple weeks finished off adding the remaining ties and hinging all 8 sets of switch points.

Still a few more smaller sections of track to complete, but getting this one out of the way is a bit of a milestone!

-T.

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 03-26-2009 | 04:03 AM
Posted in: Latest Posts | Track Construction | Video

No Comments »

No comments yet.

Comments RSS TrackBack URI

 

Leave a comment