Home

Day 35

All Closed up.

230407b1.jpg

The crew was here for most of the day on Saturday and got all the sheathing completed. This week the roof and siding is supposed to be put up, and that should make it look almost complete on the outside.

-Tim

About the Author:

I'm your host, Tim Warris, a product developer in Port Dover, Ontario. Since March of 2007 I have been documenting the construction of the former CNJ Bronx Terminal in HO scale. For my day job, I design track building tools for Fast Tracks, a small company I own and operate. Fast Tracks makes it fast and easy to hand lay your own trackwork. Stop by our website to learn more!

Posted by: Tim | 04-23-2007 | 09:04 AM
Posted in: Barn Raisin'!

No Comments

No comments yet.

Comments RSS

Sorry, the comment form is closed at this time.